Why $79.81 is the floor for this shop, not a rate to copy
A break-even rate is every cost of running the shop for a year divided by the hours that actually get billed. For the sample shop that is wages, payroll burden, the van, insurance, the phones, software and the part-time person who answers calls, spread over the crew's billable hours.
It is a floor because at $79.81 the owner gets their wage and the business makes nothing. A slow week, a callback or one bad estimate and the year goes negative. Your own floor will be different: more trucks, a bigger office or higher wages all move it, and so does how many of the paid hours turn into billed hours.
The installer in the sample earns $25 an hour. The gap between $25 and $79.81 is not greed; it is everything else the hour has to pay for.
The billable hours problem
The number that moves an HVAC rate most is not the wage, it is the share of the day that gets billed. A tech who is only 50% efficient has 4 hours to charge for out of 8. The other 4 go to travel, parts runs, paperwork and calls back to customers.
One owner's teaching example shows how big that is. A three-truck shop with about $232,800 a year of costs, owner pay and office included, pays each tech for 2,000 hours but only bills about 1,000. Spread over every paid hour, the costs come to $38.80 an hour. Spread over the hours that really bill, it is $77.60 an hour, double, before a cent of profit.
That is why a rate built from paid hours always looks fine on paper and loses money in the bank. Count billable hours honestly, from your own job tickets if you have them. The true hourly rate guide walks through the method.
Using a labor rate calculator for HVAC
There is no single HVAC labor rate calculator that knows your shop, but the math fits in a few boxes: yearly wages and burden, yearly overhead, the people on the crew and the share of their hours that bill. Put those into the free true hourly rate calculator and it gives you your break-even rate per billable hour.
Once you have the rate, the free HVAC cost estimator uses it to price a changeout by the ton: hours per ton, equipment per ton, permit and disposal, then profit on top. The full HVAC Install Pricing Calculator spreadsheet goes further and works the rate out from your own wages and overhead on its Shop Setup tab.
Hourly rates other shops work out
The rates in the material we studied are wide because each includes different things:
| A | B | C | |
|---|---|---|---|
| 1 | Example | What the rate covers | Rate |
| 2 | Sample shop, 3 people | Break-even only, no profit | $79.81 an hour |
| 3 | One-truck owner | Costs, 50% margin and tax | $155 an hour |
| 4 | Three-truck shop | Costs, 50% margin and tax | $351 an hour |
| 5 | Sample changeout | What the job earns per labour hour | about $208 an hour |
The one-truck and three-truck figures come from the same owner. The bigger shop needs more than twice the rate because it carries an office, more vans and more people who are paid but not billing. Neither is a target to copy; each is what that shop's own costs require.
A day rate falls out of the same math. At the sample shop's $79.81 and 8 billable hours, one person-day costs $638.48 before profit. Drive time is only a billable hour if you charge for it.
Flat rate pricing for service calls
Flat rate does not replace an hourly rate, it is built on top of one. Each repair on the price book is the task's hours times your rate, plus the part and its markup, plus profit.
Two habits keep flat rate honest. First, pad the clock: pricing a 1-hour task as 1.5 hours means the tech is not racing the quote when a bolt seizes. At the sample rate that is $119.72 of labour before the part. Second, keep part prices current. When a distributor raises a part 5%, the flat rate has to move too, or the margin quietly shrinks one call at a time.
One repair example shows the result: a $200 blower motor and 1 hour of labour came to a $447 break-even, sold at $680.
Markup on equipment and parts
HVAC shops mark up what they buy in very different ways:
- A plain markup on cost. The sample sheet starts at 30% on material. A 30% markup is a 23% margin on that line.
- Divide repair parts by 0.5. A $20 run capacitor sells for $40. That is a 100% markup, or a 50% margin on the part.
- Divide the whole job by a margin. One changeout example divides total cost by 0.55 to keep 45% gross profit, which is an 82% markup on cost.
Markup and margin are easy to mix up, and the mix-up costs money: adding 45% to cost gives a 31% margin, not 45%. The markup vs margin guide has the conversion.
A heavier markup on equipment also has a side effect. It makes a bigger unit carry more overhead than a smaller one, even though the shop's office costs the same that day. Many shops get a fairer price by carrying overhead in the hourly rate and keeping the equipment markup modest. More on that in overhead and profit.
What profit margin an HVAC install keeps
The sample changeout keeps $3,424.96 above full cost on a $10,164.47 price before tax, a 33.7% margin. That is after the owner has been paid a wage, so it is real profit, not the owner's pay in disguise. The full job is broken down line by line in how to price HVAC jobs.
Other examples aim lower or higher. One installer prices every changeout to walk away with 25% net. Another example stacks 25% overhead, 25% net, a 3% commission and a 9% financing dealer fee into one divisor. Each of those extra pieces is a real cost on the jobs where it applies, so add commission and the lender's fee only to the quotes that carry them.
Set the margin before the job, not after. If a customer pushes back on price, you then know exactly which piece you are giving up, and you can say no when the answer is your profit.
Check your rate after every job
A rate is a guess until the job log proves it. After each install, compare the hours you quoted with the hours the crew actually took, and the parts you priced with the parts you used. If installs keep running over, the hours per job are wrong, not the rate. If every job comes in on time and the year still ends thin, the billable share is lower than you assumed and the rate needs to go up.
